Methods Engineer
| 行业 | Engineering | 职位 | Other Engineering |
|---|---|---|---|
| 招聘部门 | 招聘人数 | 若干 | |
| 工作地区 | Metro Manila (NCR)Pasay | 工作性质 | Full Time |
| 性别要求 | Male | 婚姻要求 | No marital status restrictions |
| 学历要求 | Open to all levels | 工作经验 | 不限 |
| 年龄要求 | 18岁以上 | 待遇水平 | 面议 |
| 更新日期 | 2022-09-27 | 有效期至 | Valid for a long time |
职位描述
Candidate must possess at least Professional License (Passed Board/Bar/Professional License Exam) in Engineering (Civil) or equivalent.With proven work experience as Method Engineer.At least 10 Year(s) as Method Engineer.With extensive experience in vertical, road, bridges, infra, marine, and horizontal projects.
Job Description:
Report to a Project Engineer (if any) or in case of sufficient seniority perform part of project engineering functions. In case of insufficient seniority report to an Expert Method Engineer or to a Project Engineer.Draw up a general engineering schedule as stipulated by the contract to be revised by the Project.Identify technical problems and make the necessary technical decisions within the limitations imposed by contractual requirements.Draw up definitions and detailed specifications of tasks and sub-tasks or supervise their drafting by other resources if requested.Define the materials or services to be purchased for engineering tasks within the allocated resource budget, in conjunction with the Project Engineer.Approve all the technical design necessary for the purchase and/or construction of products to be supplied to the Client.Participate to meetings to examine and, if necessary, audit the technical design, and take part in technical examinations with the Client. Cost and scheduling decisions which influence contractual obligations or other functions must be approved by the Project Engineer (if any) and communicated to the Engineering Manager and Project Manager.Notify the Project Engineer (if any) and Engineering Manager of any problems occurring with any other engineering areas.Perform all the necessary engineering verifications and calculations necessary for the methodology to be implemented.Supervise and verify the drafting describing the methodology to be implemented.Summarize and clarify in a manual all methodology activities, clearly identifying the show stoppers (if any). Transfer inside the manual all useful data derived by analyses performed by others.Ensure that the operation people on site receive all useful data in form of reports, manuals, drawings.Follow up activities onshore or in any construction place deemed necessary by the project.All the above activities could be performed with different level of deepness for Project or Bid assistance performance.Ensure the Management of Outsourced Engineering with Subcontractors.