LPG Technician / PM Technician
| 行业 | Engineering | 职位 | Oil / Gas |
|---|---|---|---|
| 招聘部门 | 招聘人数 | 若干 | |
| 工作地区 | Bataan | 工作性质 | Full Time |
| 性别要求 | Male | 婚姻要求 | No marital status restrictions |
| 学历要求 | Junior High School | 工作经验 | 不限 |
| 年龄要求 | 18岁以上 | 待遇水平 | 面议 |
| 更新日期 | 2022-09-27 | 有效期至 | Valid for a long time |
职位描述
Job description
Reports To: LPG Technician Lead / Cluster Supervisor
Position Purpose: To conduct monitoring and preventive maintenance of the LPG supply at Vista Mall in Bataan.
Key Result Areas:
Areas of Coverage:
o Storage Tank Farm
Receive LPG deliveries from ILC
Conduct daily stock inventory and reconciliation
Order LPG on behalf of Vista Mall
Ensure that the surrounding has a high safe environment
Report any abnormalities of the system. (i.e. paint status corrosion, visible pitting, regulator, pressure gauges, etc.)
Conduct monthly leak testing
o Main Gas Distribution Line
Conduct random surveillance check to LPG main gas distribution line
Intervene and report any Mall vendor activities that may create potential risk to gas piping system
Report any abnormalities of the system. (i.e. paint status corrosion, visible pitting, pipe support, etc.)
Conduct monthly leak testing
Job Description, Page 2 of 2
o Locators’ stub-out
Conduct random surveillance check and inquiries on their operation about any abnormalities.
Conduct random surveillance check and inquiries on their operation about any abnormalities.
Timely submission of gas meter reading to billing and collection section of ILC.
Conduct periodic (annual) basic safety check (visual) on locator gas piping system.
o Emergency Response
Respond promptly to locators’ complaint
Respond promptly to locators’ complain
If there is a need to shut down, technician should communicate to his supervisor, customer, and mall management for his recommendations.
If there is a need to shut down, technician should communicate to his supervisor, customer, and mall management for his recommendations.
o Education & Training
If there is a need to shut down, technician should communicate to his supervisor, customer, and mall management for his recommendations.
If there is a need to shut down, technician should communicate to his supervisor, customer, and mall management for his recommendations.
Monitoring Activities:
o Manifold Size
o HP Regulator Brand and Model
o LP Regulator Brand and Model
o Gas Meter Model
o Regulator pressure
o LP Gauge Reading at Tank Farm and Eqpt. Side
o Pipe Size
o Pressure Gauge Reading Entering Gas Meter
o Tank and Manifold
o Appurtenance Condition
o Leak Detectors
o Signages
o Pipepline
o Storage and Immediate Surroundings
o MDPE and Underground Pipeline
o Equipment Side
Take photos and document the equipment in the store
Perform rework
Perform other functions as may be deemed by the Contract Manager
Adhere Sodexo’s way of Service Standards
HSE (Health, Safety, and Environment) Compliant
With LPG Certification or Licensed